Case study
Leak in ductile iron pipeline caused by deterioration of an old joint

NEO
See product- Application
- marines
- Pipe Type (material + DN/OD)
- Ductile iron — 24"
- Pain/Context
- Leak caused by corrosion in an old joint; need to intervene without welding or removing pipeline sections
- Sector
- Water supply / Drinking water networks
- Country
- Mexico
- Keywords
- repair, ductile iron, drinking water, joint corrosion, corrective maintenance
In large drinking water networks, ageing joints can deteriorate over time, leading to leaks caused by corrosion in bolts and gaskets. In the 24" pipeline in Veracruz operated by Grupo MAS Agua, the replacement of a deteriorated joint was completed using a NEO+ 650–675 coupling compatible with the existing pipe ends.

In large drinking water networks, ageing joints can deteriorate over time, leading to leaks caused by corrosion in bolts and gaskets. In the 24" pipeline in Veracruz operated by Grupo MAS Agua, the replacement of a deteriorated joint was completed using a NEO+ 650–675 coupling compatible with the existing pipe ends.





Large diameter and extremely limited operational window (only 2 hours)