Case study

Downpipe renovation in high-rise buildings with extremely limited access

Application
marines
Pipe Type (material + DN/OD)
Ductile iron — DN250
Pain/Context
High-rise renovation with minimal accessibility
Sector
Building / Vertical drainage
Country
China
Keywords
connect, ductile iron, high-rise building, confined space, vertical drainage

In high-rise buildings, vertical drainage systems often include sections with very restricted access, making it difficult to dismantle existing pipes during renovation works. At the Jin Mao Tower in Shanghai, the modernisation of the downpipe system was carried out using REP DN250 couplings, enabling intervention in an extremely confined space and the replacement of components installed more than 20 years earlier.

In high-rise buildings, vertical drainage systems often include sections with very restricted access, making it difficult to dismantle existing pipes during renovation works. At the Jin Mao Tower in Shanghai, the modernisation of the downpipe system was carried out using REP DN250 couplings, enabling intervention in an extremely confined space and the replacement of components installed more than 20 years earlier.

Large diameter and extremely limited operational window (only 2 hours)