Case study
Connecting different pipe materials in renovation works

NEO
See product- Application
- marines
- Pipe Type (material + DN/OD)
- GRP — DN2450
- Pain/Context
- Large diameter and extremely limited operational window (only 2 hours)
- Sector
- Irrigation / Hydraulic infrastructure
- Country
- Peru
- Keywords
- repair, GRP, irrigation, large diameter, limited operation window
In large-diameter transmission lines, draining and refilling the pipeline can consume almost the entire intervention window, leaving only minutes to perform the actual repair. In the Los Olmos irrigation project in Peru, a DN2450 GRP pipeline was repaired in just 45 minutes, allowing the team to meet a total operational window of only two hours.

In large-diameter transmission lines, draining and refilling the pipeline can consume almost the entire intervention window, leaving only minutes to perform the actual repair. In the Los Olmos irrigation project in Peru, a DN2450 GRP pipeline was repaired in just 45 minutes, allowing the team to meet a total operational window of only two hours.







Large diameter and extremely limited operational window (only 2 hours)